
Lifting solutions for businessesOn the roof,on the job site
- Montreal's North Shore
- 24 hours a day
For businesses
- A rooftop unit to replace
- Prefab walls to set
- Precast concrete components set in place
- A steel structure raised piece by piece
- A machine to get out of a building
Rooftop units
Lower the old rooftop unit and lift the new one.
See the serviceSigns
Hold the sign in position while it is installed.
See the serviceMaterials at height
Lift pallets and beams to a floor or rooftop.
See the serviceMachinery
Remove a machine or position it on its base.
See the serviceSteel structure
Bring each steel beam to the connectors.
See the serviceHeavy equipment
Unload, move or position heavy equipment.
See the service
Anything you need lifted or moved,we take care of it.
Don't see your project in our examples? Tell us about it and the operator will tell you how we'd handle it.
« These are jobs we do often. Regular, I'd even say. We get one or two a month, maybe. »
Our operator, on steel structure job sites
Beforethe lift
Hello! What can we explain before you call?
Height and reach
One storey, two or three, or higher: it's one of the first questions on our quote form, along with the approximate weight. Together they determine how the crane sets up. A boom truck stops at light loads set down near the truck; the mobile crane takes over as soon as the height or the reach grows.
Prefab walls and precast concrete
Prefab walls and precast concrete components arrive ready-made, on a trailer. The crane picks them up one at a time and sets each one in place while the crew lines it up. Concrete is heavy for its size: the weight of the heaviest piece and the distance to where it goes are the first two things to tell us.
Access to the building
Parking to clear, a narrow street, a delivery to coordinate: access is what determines the manoeuvre, and it gets settled before the day of the lift, not that morning. Tell us what you know about the site; the rest gets planned with you.
A crew around the machine
On a steel frame, it takes about four people to keep it moving: two connectors waiting for the piece up in the lifts, one man on the ground to hook it up, and often a second one lending a hand. “We can do a piece about every three minutes,” our operator says, “because they're on a deadline to frame the whole structure.”
Releasing without climbing
Nobody has to climb on top of the beam to unhook it. “I have a lever right inside the cab”: once the piece is in place and bolted, “I just press two buttons and they release on their own.” Thirty-five years ago, some guys climbed. Today it's done from the ground.
Day and night
Broken equipment or a surprise on site doesn't always wait until Monday morning. Grues DSS answers day and night, seven days a week.
Pick a question
A question that isn't here? Call us, an operator answers 24 hours a day.
