A bundle of steel bars lifted on two chains
← For businesses

Lifting solutionsMaterialsat height

  • Montreal's North Shore
  • 24 hours a day

Materials at height

  • Pallets, beams
  • Up onto a roof or a floor, no hoist needed
  • Set where the crew is waiting

Anything you need lifted or moved,we take care of it.

Don't see your project in our examples? Tell us about it and the operator will tell you how we'd handle it.

« It really has to move. It's one piece right behind the other. »

The operator, on the pace of a job site

Beforethe lift

Les Grues DSS Inc.The questions we get most

Hello! What can we explain before you call?

The pace

On a steel frame, the crew sets a piece about every three minutes, and the crane sets the rhythm: it brings the piece into a man's hand, we unhook, we go again. For materials the logic is the same: whatever is ready on the ground goes up without waiting.

Pick a question

A question that isn't here? Call us, an operator answers 24 hours a day.